2 Delivery and handling

Transport

VPB/VPBS should be transported and stored vertically in
a dry place. The VPB/VPBS may, however, be carefully
laid on its back when being moved into a building.

Assembly

The water heater is only designed for upright installa-
tion.
Position the water heater on a firm base that can bear
its weight, preferably on a concrete floor or founda-
tion. Use the water heater's adjustable feet to obtain
a horizontal and stable set-up.
Pipes must be routed from the safety valve to a suit-
able floor drain.
The water heater's installation area should always
have a temperature of at least 10 °C and max 30 °C.
6
Chapter 2 |
Delivery and handling

Supplied components

VPB/VPBS Stainless steel
0
R
Pressure reduction valve
(expansion vessel)
2 x Solenoid valve
Cold water shut-off and ex-
pansion relief valve,
Location
The kit of supplied items is placed on top of the product.
Armoured hose
2 x Connector with cable
Expansion vessel with holder
water heater
2 x Tundish
Gasket