Nibe VPB Series User's And Installer's Manual
Nibe VPB Series User's And Installer's Manual

Nibe VPB Series User's And Installer's Manual

Water heater, accumulator tank
Hide thumbs Also See for VPB Series:

Advertisement

CHB EN 1839-4
431320
Water heater
Accumulator tank
VPB/VPBS
USER AND INSTALLER MANUAL

Advertisement

Table of Contents
loading

Summary of Contents for Nibe VPB Series

  • Page 1 CHB EN 1839-4 USER AND INSTALLER MANUAL 431320 Water heater Accumulator tank VPB/VPBS...
  • Page 3: Table Of Contents

    Table of Contents 1 Important information 2 For the User 3 For the Installer 4 Technical data Contact information VPB/VPBS Table of Contents...
  • Page 4: Important Information

    It must be disposed of at a modifications are reserved. special waste station or dealer who provides this type ©NIBE 2019. of service. Improper disposal of the product by the user results in administrative penalties in accordance with current le- SYMBOLS gislation.
  • Page 5 INSPECTION OF THE INSTALLATION Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be carried out by a suitably qualified person. Description Notes Signature Date ✔ Heat pump (page 10) Shut off valves Hot water (page Shut off valves...
  • Page 6: For The User

    For service, contact the installer. Serial number (PF3) (14 digits) and installation date should always be stated. EMPTYING Only replacement parts supplied by NIBE may be used. Water heater Draining is performed through the siphon (using hose) in the cold water connection (XL3).
  • Page 7: For The Installer

    3 For the Installer General Assembly 15 - 40 mm VPB/VPBS is a series water heater, which is suitable for The water heater is only designed for upright installation. connection to an external heat source. The water heater’s installation area should always have The water tank has internal copper, stainless steel or a temperature of at least 10 °C (frost-free).
  • Page 8 Component positions VPB 200 VPB 300 / VPBS 300 XL5** XL13 XL14 XL5** QM22 QM22 The figure shows VPBS 300 (**Not VPB/VPBS Cu) Chapter 3 | For the Installer VPB/VPBS...
  • Page 9: Pipe Connections

    EXPLANATION Pipe connections Connection, cold water Connection, hot water Connection, hot water circulation (does not apply to VPB/VPBS -Cu) Docking connection, supply line (from heat pump*) Docking connection, return line (to heat pump*) XL13 Connection, supply line (from solar heating system) (Only VPBS 300) XL14 Connection, return line (to solar heating system) (Only VPBS 300) HVAC components...
  • Page 10 along its entire length and ensure that it is frost proof. Installation The mouth of the overflow pipe must be visible and not placed close to electrical components. REMOVING THE COVERS Ensure that incoming water is clean. When using a private well, it may be necessary to supplement with Front cover an extra water filter.
  • Page 11 HEAT PUMP COLD AND HOT WATER The heat pump’s supply and return are connected to Cold and hot water are connected to XL3 and XL4 on XL8 and XL9 on VPB/VPBS. VPB/VPBS. There must be a mixer valve if the temper- ature can exceed 60°C.
  • Page 12 Radiator system To ground heat Domestic hot water VPB/VPBS can be docked with another heat source, for example NIBE F1155. Hot water circulation To solar heating system VPBS 300 can be docked to solar heating system. Chapter 3 | For the Installer...
  • Page 13: Filling And Venting

    START-UP AND INSPECTION Filling Pressure drop diagram, charge coil FILLING AND VENTING Docking connection, supply line (XL8) and docking con- nection, return line (XL9). Filling the hot water heater VPB 200 Open a hot water tap in the house. Pressure drop Tryckfall Fill the hot water heater through the cold water (kPa)
  • Page 14: Electrical Installation

    DIRECT-CURRENT ANODE Electrical installation VPB/VPBS Enamel is equipped with direct-current anode and enclosed with potentiostat from the factory. The NOTE anode cable (W1) is installed in the anode from the factory and only needs to be connected to the potentio- Electrical installation and service must be car- stat.
  • Page 15: Technical Data

    4 Technical data Dimensions VPB 300/VPBS 300 VPB 200 Free space for concealed pipe routing VPB/VPBS Chapter 4 | Technical data...
  • Page 16: Technical Specifications

    Heating time (10°C to 80°C) 8 kW charge power hours Max operating temperature °C Max pressure, primary side bar/MPa 3/0.3 Max pressure, water heater bar/MPa 10/1.0 Compatible NIBE heat pumps F1126-8,12, F1145-6,8,10,12, F2040-8,12,16, F1155-6,12,16, F2120-8,12,16 Height 1500 Required ceiling height 1670 Width Depth Net weight Part No.
  • Page 17 Heating time (10°C to 80°C) 8 kW charge power hours Max operating temperature °C Max pressure, primary side bar/MPa 3/0.3 Max pressure, water heater bar/MPa 10/1.0 Compatible NIBE heat pumps F1126-8,12, F1145-6,8,10,12, F2040-8,12,16, F1155-6,12,16, F2120-8,12,16 Height 1800 Required ceiling height 1950 Width Depth Net weight Part No.
  • Page 19: Contact Information

    Tel: +46 (0)433-27 3000 kuzmin@evan.ru info@nibe.se nibe-evan.ru nibe.se SWITZERLAND NIBE Wärmetechnik c/o ait Schweiz Industriepark, CH-6246 Altishofen Tel. +41 (0)58 252 21 00 info@nibe.ch nibe.ch For countries not mentioned in this list, contact NIBE Sweden or check nibe.eu for more information.
  • Page 20 WS release date: 2019-01-10 15:59 Publish date: 2019-01-11 06:53 This manual is a publication from NIBE Energy Systems. All product illustrations, facts and data are based on the available information at the time of the publication’s approval. NIBE Energy Systems makes reservations for any factual or printing errors in this manual.

This manual is also suitable for:

Vpbs seriesVpb 200Vpb 300Vpbs 300

Table of Contents