1
Preparing the Machine
No Parts Required
Procedure
1.
Park the machine on a level surface and lower
the cutting units.
2.
Engage the parking brake.
3.
Shut off the engine and remove the key.
2
Disconnecting the Battery
No Parts Required
Procedure
1.
Open the battery cover on the side of the shroud
(Figure
2).
Note:
Press down on the flat surface above the
battery cover to ease the removal of the cover.
1. Battery cover
Figure 1
Figure 2
2. Press down here.
2.
Disconnect the negative (black) battery cable.
1. Battery
3.
Slip the rubber boot off the positive terminal, and
disconnect the cable.
g351500
3
Installing the Reflector
Decals
Parts needed for this procedure:
2
Reflector decal (front—yellow)
2
Reflector decal (back—red)
Installing the Front Reflector
Machines with a Roll Bar
1.
Clean the front edge of the platform with alcohol,
and allow it to dry
g020758
4
Figure 3
(Figure
4).
g020451