Frequently Asked Questions - E-Mon Din-Mon D5 Installation Instructions Manual

Smart meter
Table of Contents

Advertisement

11.0 FREQUENTLY ASKED QUESTIONS

Q. When providing line voltage to the meter, can I tap off from the same breaker I
am monitoring?
A. Yes, the voltage can be pulled from the same breaker being monitored.
Q. Can the meter's line voltage wires be run in the same conduit as the sensor
leads?
A. Yes. There will be no effect if the sensor leads and line voltage wires are run in the
same conduit.
Q. Can the meter's communication wires and line voltage be run in the same
conduit?
A. It is not recommended to run these wires together due to noise concerns and their
effects on the communications signal integrity. Communications wires can be
routed separately using a 3/4" conduit port.
Q. How do I find the cost for kWh and kW to bill my tenants?
A. Your local utility bill should list the cost per kWh and kW. If not, simply call your
utility and ask them to provide you with the cost per kWh and kW.
Q. What size wire do I use for the line voltage leads?
A. These wires are normally sized at #14 AWG, but be sure to confirm this
requirement with your local and national electrical code requirements.
Q. What size wire should I use to extend the current sensor leads?
A. These wires are normally 14-22 AWG, twisted-pair arrangement. Consult your
electrical code for proper wiring requirements.
55
DIN-MON™ SMART METER
62-0442—05

Advertisement

Table of Contents
loading

This manual is also suitable for:

Din-mon e-d5-480100-s03spl3-v3kit3

Table of Contents