E-Mon Din-Mon D5 Installation Instructions Manual page 18

Smart meter
Table of Contents

Advertisement

DIN-MON™ SMART METER
c. The terminal cover has breakable teeth to let the wires feed through, break
the teeth as needed. Replace the terminal cover and secure in place.
d. Energize the AC main power input. The meter display will light up showing
the startup screens, then scroll through the following screens. Each display is
visible for 5 seconds.
Display screens are as follows:
Screen 1 - T otal kilowatt-hours (kWh) consumed
Screen 2 - Peak demand (kW) with date & time stamp
Screen 3 - Present load (kW)
Screen 4 - Current (amps) per phase
Screen 5 - Voltage (volts) phase to neutral (for WYE service)
Screen 6 - Voltage (volts) phase to phase
Screen 7 - Power factor (PF) per phase
e. Verify the voltage readings using an AC voltmeter. Typical readings shown
below are measured phase to neutral for 4-wire and phase to phase for 3-
wire. Readings should be +/- 10% of nominal.
Meter Type
120/208V, 3ø, 4 Wire
120/240V, 1ø, 3 Wire
127/220V, 1ø, 3 Wire
120V, 1ø, 2 Wire
277/480V , 3ø, 4 Wire
277V, 1ø, 2 Wire
240V, 3ø, 3 Wire
400V, 3ø, 4 Wire
480V, 3ø, 3 Wire
600V, 3ø, 4 Wire
NOTE: For 3-Wire (Delta) systems, the voltages are measured Phase to Phase.
For 4-Wire (Wye) systems the voltages are measured Phase to Neutral.
Delta meters are powered by Phases A and B. Wye meters are powered
by Phase A to Neutral.
62-0442—05
Nominal Voltage
120 VAC (L-N)
277 VAC (L-N)
240 VAC (L-L)
230 VAC (L-N)
480 VAC (L-L)
347 VAC (L-N)
18
Limits (+/- 10%)
108 to 132 VAC
249 to 305 VAC
216 to 264 VAC
207 to 253 VAC
432 to 528 VAC
312 to 380 VAC

Advertisement

Table of Contents
loading

This manual is also suitable for:

Din-mon e-d5-480100-s03spl3-v3kit3

Table of Contents