Phasing Of Line Voltage - E-Mon Din-Mon D5 Installation Instructions Manual

Smart meter
Table of Contents

Advertisement

4.4.1 Phasing of Line Voltage

The 3-phase AC power input must be in proper phase sequence. If the sequence is
incorrect or a phase is missing, there will be a message on the meter's display: "PH
Seq Err" or "PH Loss x" where 'x' is the missing phase. (Refer to the section on Line
Voltage Diagnostics if this message is present.) When the line voltage is connected
correctly , the error message will not be present.
Wait for the meter display to scroll to the voltage display. Verify that the meter reads
correct voltages on all phases.
Once the meter displays the correct line voltages and there are no error messages,
you are ready to connect the current sensors to the meter. Before continuing with the
installation, verify that the six screens display as follows:
Screen 1 (kWh):
Screen 2 (kW Peak Demand):
Screen 3 (Load/Date and Time): Should read 0.0 kW load.
Screen 4 (Amps per Phase):
Screen 5 (AC Volts, L-N):
Screen 6 (AC Volts, L-L):
Screen 7 (Power Factor):
NOTE: The meter kWh and/or kW peak demand readings can be reset later.
Should read 0.0 kWh.
kW peak should read 0.0 kW. There will not be a
date/time stamp yet.
There should be 0.0 on all three phases.
There should be 0.0 PF on all three phases.
19
DIN-MON™ SMART METER
62-0442—05

Advertisement

Table of Contents
loading

This manual is also suitable for:

Din-mon e-d5-480100-s03spl3-v3kit3

Table of Contents