1
Remove the 12 screws and then remove the
2 JOG dial Sections.
(BPZ30P080FNI)
Screw tightening order
9
10
8
7
B
11
12
2
Disconnect the 2 flexible cables.
(CN3001, 3005, 3201, 3205)
3
Remove the Barrier.
Caution:
C
Cannot be reused.
D
[3-15] JOG dial rotation load adjustment
1
Reconnect the PCB Assemblies on the
Control panel Section.
E
2
Connect the JOG dial Section with extension
jig FFC.
Caution:
JOG dial rotary load adjustment executes
CN3001/CN3201 of JLCD Assy in
a state of non-connection.
F
Adjustment
68
1
2
3
4
2
1
6
5
CN3005/3205
CN3005/3205
XDJ-XZ
2
3
JOG dial Section
1
×6
×6
• Bottom view
2
CN3005/3205
CN3005/3205
• Bottom view
2
Extension jig FFC (GGD1903)
3
4
JOG dial Section
1
×6
×6
2
3
Barrier
CN3001/3201
CN3001/3201
CN4503
CN4503
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents