Download Print this page

Otto Bock Renegade RS1 Instructions For Use Manual page 6

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6
Renegade® Instructions for Use
Product Number: RS1
Assembly
Bench Alignment
Dynamic Alignment
Troubleshooting
Instructions for Use (R-720-003, Rev. J)
6 |
Renegade_A4.indd 6
The Renegade® foot module is pre-assembled consisting of a graphite
component (keel), sole plate, Spectra™ sock, and foot shell. Foam stiffening
bumpers for increasing heel stiffness are provided. After dynamic alignment,
torque pyramid adjustment screws to the manufacturer's specifications.
pyramid adjustment screws with a thread locking adhesive (i.e., Loctite 242).
Prior to donning the prosthesis:
• Plantarflex/Dorsiflexion foot to match the shoe heel height.
• Adduct/Abduct socket to provide appropriate frontal plane angle.
• Flex/Extend socket to provide appropriate sagittal plane angle.
• Move the socket linearly to ensure the weight line falls along the anterior edge
of the pylon (see illustration).
During loading response, the sole plate and Z-Shock store energy and release it
during midstance. This action provides momentum for the keel to store energy
and release it during terminal stance. To optimize the heel to toe rollover motion,
adjust the following variables:
• Anterior/posterior foot placement
• Dorsiflexion/plantarflexion
• Heel stiffness
Heel too soft
Symptoms
• Foot flat occurs too rapidly
• Toe feels excessively stiff
• Knee hyperextension
Solutions
• Shift socket anteriorly in relation to the foot
• Attach foam stiffening bumpers
Secure
English EU
RS1 Renegade®
08.02.2021 15:10:59

Advertisement

loading

This manual is also suitable for:

L5981