Movement; Special Conditions Of Use - RAMMER RD2019 Operator's Manual

Cutter-crasher rammer
Table of Contents

Advertisement

Operation
2. Connect hoses. An installation inspection must be carried out after the product
has been mounted on the carrier. In the installation inspection certain
specifications (operating pressure, oil flow, etc.) are checked so that they are
within given limits. See "Product specifications" on page 78.
3. Open the ball valves.
4. Remove air from the hoses by carefully operating the crusher cylinder. Open
and close empty jaws several times.

6.4 MOVEMENT

The transportation and parking positions are shown below. When moving the
carrier, ensure that the crusher is not too close to the carrier.

6.5 SPECIAL CONDITIONS OF USE

The equipment may require modifications, special operating techniques, increased
maintenance or special wear items if it is used in conditions that differ from normal
breaking or demolition work. Special conditions of use are:
■ Operations in extremely low or high temperatures
■ Use of special hydraulic fluids
■ Operations with special carrier
■ Other special conditions
Page 38 - Operation
COPYRIGHT © 2013 SANDVIK MINING AND CONSTRUCTION OY
RD2019 A-JAW, D-JAW, S-JAW, M-JAW

Advertisement

Table of Contents
loading

This manual is also suitable for:

A-jawD-jawS-jawM-jaw

Table of Contents