Checks Before Commissioning - Borger Classic FL Series Operating Manual

Rotary lobe pump
Table of Contents

Advertisement

Transportation, Storage and Installation
4.5

Checks before commissioning

Malfunctions
Moving parts
BA-Classic FL_en-US, 03.05.2018
NOTICE!
Inadequate maintenance can result in malfunctions and
damage!
— When the machine is stored for longer periods, rotate the
shafts several times after about six months (or more often,
depending on the storage conditions), according to
4.5.1 "Checking smooth running following storage and long
downtimes" on page 80.
— This way the gears, bearings and shaft seals are moved
and coated again with lubricant.
DANGER!
Risk of injury due to rotating parts!
Moving parts can cause severe injury.
— Do not reach into rotating parts or handle rotating parts when
the machine is in operation.
— Never open protective covers when in operation.
— Perform work on the Börger machine only when stationary.
— Observe the delay time: Prior to opening protective covers,
make sure that all components have stopped moving.
— Shut down the Börger machine and upstream and down-
stream system components as described in
"Downtimes" on page 93 before carrying out any work on the
Börger machine or accessories.
— The operating person is obligated to check that all safety
equipment is installed as described in
"Description of the safety equipment" on page 25 and fully
functional before putting the machine into operation.
— The Börger machine must only be switched on when the
inlet and outlet connections have been established and the
maintenance openings have been securely installed.
www.boerger.de / www.boerger.com
Ä Chapter
Ä Chapter 5.3
Ä Chapter 2.8
79

Advertisement

Table of Contents
loading

This manual is also suitable for:

Classic fl 518Classic fl 776Classic fl 1036

Table of Contents