Measures Following On Demand Work - Borger Classic FL Series Operating Manual

Rotary lobe pump
Table of Contents

Advertisement

5.6

Measures following on demand work!

104
Following completion of the work and before starting the unit, carry
out the following steps:
Personnel:
Protective equipment:
Special tool:
— Read and follow the safety instructions detailed in
2.12 "Safety instructions for maintenance and rectifying mal-
functions" on page 30.
1.
Check all screws that have been loosened previously for firm
seat.
2.
Check whether all safety devices and covers that have been
removed previously are reinstalled properly.
3.
Ensure that all tools, materials and other equipment used has
been removed from the work area.
4.
Clean the work area and remove any spilled substances, e.g.
liquids, processing material or similar.
5.
Reset the emergency stop devices, if required.
6.
Confirm malfunctions at the control unit.
7.
Ensure that nobody enters the hazardous area.
8.
Ensure that all safety features of the unit function perfectly.
9.
Take the unit into operation again according to
"Continuous operation" on page 92.
www.boerger.de / www.boerger.com
n
Mechanics
n
Occupational safety clothing, chemical
resistant
n
Safety shoes
n
Safety gloves, chemical-resistant
n
Safety goggles
Tools, general
n
BA-Classic FL_en-US, 03.05.2018
Operation
Ä Chapter
Ä Chapter 5.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Classic fl 518Classic fl 776Classic fl 1036

Table of Contents