Installing Digital Base Devices - ABB Scalable I/O Applications Manual

Table of Contents

Advertisement

3.2 Installing digital base devices

Installing digital base devices
Use this procedure to install the digital base device. See also the product manual
for the robot controller, listed in
1
2
3
4
5
Application manual - Scalable I/O
3HAC070208-001 Revision: F
Action
DANGER
Before commencing any work inside the cabinet
make sure that the main power has been switched
off.
Fit the device by snapping it onto the mounting
rail.
Connect the Ethernet cable from the robot control-
ler, or the EtherNet/IP scanner, to any of the con-
nectors X3 or X5.
Connect the logic power supply to connector X4.
Connect process power supply and GND to the
input and output connectors X1 and X2.
Note
The process power supply also powers the optical
interface to the add-ons.
© Copyright 2019-2022 ABB. All rights reserved.
3 Hardware installation
3.2 Installing digital base devices
References on page
7.
Note
xx1700000275
For information about the pinout
see
Connectors on page
The process power supply must be
supplied separately. Connecting
the process power supply through
the logical power supply connector
may damage the device.
18.
CAUTION
Continues on next page
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Robotware 7.7

Table of Contents