Final Tests - Cisco CE 2000 Platform SCE 2000 4xGBE Installation And Configuration Manual

Cisco systems ce 2000 platform installation and configuration guide
Hide thumbs Also See for CE 2000 Platform SCE 2000 4xGBE:
Table of Contents

Advertisement

Chapter 7
Basic SCE 2000 Platform Operations

Final Tests

The procedures for performing the final tests to verify that the SCE 2000 is functioning properly
are explained in the following sections:
Verifying Operational Status
After all the ports are connected, verify that the SCE 2000 is not in a Warning state.
To verify that the SCE 2000 is not in a warning state, complete the following steps:
Step 1
Step 2
A message displaying the operation status of the system appears. If the system is operating in order, the
following message appears:
System Operation status is Operational.
E
XAMPLE
The following example displays a sample output where the LEDs appear red/orange:
SCE 2000#show system operation-status
System Operation status is Operational
Viewing the User Log Counters
View the user log for errors that occurred during the installation process.
To display the user log device counters, complete the following steps:
Step 1
OL-7824-02
Verifying Operational Status (on page 7-3)
Viewing the User Log
("Viewing the User Log
On the SCE 2000 Front panel, examine that the Status LED is flashing green.
To display the operation status of the system, at the SCE 2000# prompt, type show
system operation-status and press Enter.
:
At the SCE 2000# prompt, type show logger device User-File-Log
counters and press Enter.
Counters" on page 7-3)
SCE 2000 4xGBE Installation and Configuration Guide
Starting the SCE 2000 Platform
7-3

Advertisement

Table of Contents
loading

Table of Contents