Installation And Maintenance; Preparing To Install The Sce 2000 Platform - Cisco CE 2000 Platform SCE 2000 4xGBE Installation And Configuration Manual

Cisco systems ce 2000 platform installation and configuration guide
Hide thumbs Also See for CE 2000 Platform SCE 2000 4xGBE:
Table of Contents

Advertisement

Installation and Maintenance

This chapter explains how to install a SCE 2000 platform in a rack or in a general tabletop or
workbench installation. Additionally, this chapter contains instructions for installing or replacing
the power supply units and fan modules.
Before you install, operate, or service the system, read the Site Preparation and Safety Guide. This
Warning
guide contains important safety information you should know before working with the system.
This chapter contains the following sections:

Preparing to Install the SCE 2000 Platform

Before installing your SCE 2000 platform, you should consider the power and cabling
requirements that must be in place at your installation site, the equipment you need to install the
platform, and the environmental conditions your installation site must meet to maintain normal
operation. This section guides you through the process of preparing for your SCE 2000 platform
installation and the installation in a rack. The section contains the following topics:
Tools and Parts Required (on page 4-2)
Site Requirement Guidelines (on page 4-3)
OL-7824-02
4-1
4-19
4-25
4-28
SCE 2000 4xGBE Installation and Configuration Guide
C H A P T E R 4
4-1

Advertisement

Table of Contents
loading

Table of Contents