NOTE:
There are two types of cable (wire rope) available
on this crane; 6 x 36 WS and 35 x 7 (non-rotating).
Within the limits of the load and range charts and permissible
line pull, multi-part lines allow the operator to raise a greater
load than can be raised with a single part line. Various cable
reeving (part line) is possible with the boom nose and hook
block Figure 4-7. This reeving should be performed by a
qualified rigger using standard rigging procedures.
CAUTION
Do not reeve Auxiliary Hoist rope through the rope grab.
Do reeve the Main Hoist rope through the rope grab.
(Figure 4-1)
NOTE:
Also use the rope grab when using the Main Hoist
with lattice extensions
4-4
Rope Grab
7053
FIGURE 4-4
Published 01-15-2016, Control # 526-01
RT540E OPERATOR MANUAL
In order to quick reeve the hook block without removing the
wedge socket on the end of the cable, see (Figure 4-2).
Boom Cable Reeving
When reeving the boom, always reeve the main hoist wire
rope through the rope grab; if also reeving the auxiliary hoist
rope, reeve the auxiliary hoist rope outside of the rope grab.
FIGURE 4-5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove RT540E and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF