Tpe2/Tpe5 (Power Control + Pressure Compensated Control + Electric Displacement Control); Tpe2/Tpe5 Priority - Danfoss D1 Series Service Manual

High power open circuit pumps
Table of Contents

Advertisement

Service Manual
D1 High Power Open Circuit Pumps Size 65/130/145/193/260
Operation

TPE2/TPE5 (Power Control + Pressure Compensated Control + Electric Displacement Control)

©
Danfoss | July 2019
W
Warning
(1) Adjustment is not permissible
Power Control (T) Principle and Operation
Please refer to
TPSN (Power Control + Pressure Compensated Control + Load Sensing Control)
Pressure Compensated Control (P) Principle and Operation
Please refer to
NPNN (Pressure Compensated Control)
Electric Displacement Control (E2/E5) Principle and Operation
Please refer to
NNES (Electric Displacement Control + Load Sensing Control)

TPE2/TPE5 Priority

The Pressure Compensated Control (P) has priority over the Power Control (T), and the Power Control (T)
has priority over Electric Displacement Control (EDC).
D1P 130/145+TPE5
D1P 193/260+TPE2
*Control oil filter is optional
E
B
*
MB
Vg max
L3
S
M4
on page 9
on page 17
L1527453 | AX00000292en-CN0201 | 21
Vg min
L1
L2
P400074
on page 15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the D1 Series and is the answer not in the manual?

Table of Contents