Connecting The M-126 To The Controller - PI M-126 User Manual

Precision microtranslation stage
Table of Contents

Advertisement

5 Installation
 You have prepared the load so that it can be fixed to the mounting holes in the M-126's
platform:
In addition, for models with electric drive:
 The M-126 is not connected to the controller.
 M-126.PDx: The M-126 is not connected to the power adapter.
Tools and Accessories
Fixing the load
1. Align the load so that the selected mounting holes in the platform can be used to fix it.
2. Use the screws to fix the load on the selected mounting holes in the platform.
3. Check that the load is sitting firmly on the platform of the M-126.
5.5

Connecting the M-126 to the Controller

Connecting a motor cable is only necessary for models with electric drive.
Requirements
 You have read and understood the general notes on installation (p. 17).
 You have installed the controller.
 The controller is switched off.
Tools and accessories
Motor cable, suitable for the controller (p. 12)
Suitable tools for tightening the screws to the connections
Connecting the M-126 to the controller
1. Connect the connector (f) of the motor cable to the D-sub 15 panel plug of the M-126.
2. Connect the other end of the motor cable to the controller's drive connector.
3. Use the integrated screws to secure the connections against accidental disconnection.
M-126 Precision Microtranslation Stage
The gap between the center of gravity of the load and the center of the platform is
as small as possible in all directions.
At least two points are provided for fixing the load on the platform (ideally: three
fixing points).
At least 2 socket head screws, included in the scope of delivery (p. 10)
Hex key, AF 3, included in the scope of delivery
MP42E
Version: 3.0.0
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

M-126.cg1M-126.dg1M-126.pd1M-126.pd2M-126.2s1M-126.m0

Table of Contents