Verifying System Operations - HP Visualize J5000 Upgrade Instructions

Unix workstations
Hide thumbs Also See for Visualize J5000:
Table of Contents

Advertisement

Wrapping Up

Verifying System Operations

Verifying System Operations
To verify the system operation, follow these steps:
1. Reconnect the power cables and any other cables that were
disconnected when opening the workstation.
2. Reconnect all peripheral devices and their associated power cables.
3. Verify that the terminators are reattached where necessary.
4. Power-on the system (push the power button on the front panel).
5. The console will prompt you to set the LAN ID which was recorded
earlier. It is also next to the serial number label.
6. Reset the BCH path numbers if they are different than the defaults.
7. If the console screen fails to come up, set up a serial terminal on
COM1 and remove the keyboard to force the console to COM1.
8. If the system fails to boot or power up, refer to the Solving Problems
chapter of the J5000/J7000 Owner's Guide.
If you have any questions, suggestions, or problems with our hardware or
documentation, please contact your designated Hewlett-Packard
representative.
30
Chapter 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Visualize j5600

Table of Contents