Axminster WORKSHOP AW216TS Original Instructions Manual page 11

Table of Contents

Advertisement

Fig 35
G
U
11. Put to hand four M8 Bolts with washer/nuts (U) and rip
fence rail with scale (G). Insert two bolts with washers up
through the holes to the underside end of the side extension
table (B) and lightly screw on two bolts. Place the remaining
two bolts with washer into the threaded holes to the underside
of cast iron table, see fig 35. Note: make sure to give enough
clearance between the tables and bolts for the next step.
12. Line up the machined slots in the rip fence rail (G) with the
bolts and slide the rail up against the tables. Nip up the bolts to
secure the rail, see fig 36-37.
Fig 36-37
13. Locate the rip fence (E) and lower the clamp assembly
down over the fence rail (G) and press down the locking lever
to secure in position, see fig 38.
14. Find the rip fence extension (F), slot the two 'T' bolts
mounted in the rip fence (E) into the 'T' slot on the fence
extension and nip up the butterfly knob clamps, see fig 39.
Note: the extension (F) can be set in two positions,
see fig 40.
B
G
15. Locate the hose support bracket (I) and secure it to the side
extension table (B) using a M8 bolt washer/nut (U). Insert the
holes (L) into the hose bracket, see fig 41.
16. Place a straight edge across the tables and check they are
level and make adjustment until correct.
11
E
'T' Slot
F
'T' bolt
U
ASSEMBLY
Fig 38-39-40
Butterfly knob
Fig 41
I
Continues over...

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workshop aw254ts107712107713

Table of Contents