1. Check machine is plugged into 120V outlet and main gas line is connected to broiler appliance.
2. Turn the MAIN POWER SWITCH on to start the machine.
3. On the control display window, the company logo appears with synchronizing dots for the system
startup. (Diagram 1)
4. When broiler is fully powered up, the company logo display is replaced with the HEATING UP
screen that will remain until the broiler is ready to cook (Diagram 2). It takes approximately 40
minutes for broiler to reach steady cook temperature from the room temperature.