Pin Number
1
2
3
4
5
When power is supplied to J3, JMP3 allows for one of four different dc voltages to be applied to the digital
sections of the ADC. Review the schematic (located at the end of this document) and PWB silkscreen
(see
Figure
3) for further details.
4.1
ADC Power
The device installed on the modular MSOP-8EVM has several options with regard to its power source.
Refer to the schematic shown at the end of this document for details about the following information.
JMP1 and JMP3 allow the user to select the power supply used by the ADC. When JMP1 is in the default
factory position (shunt on pins 1-2), power to the ADC comes from J3.3 or TP5. Single gate digital buffers
(U3, U5, and U6) are installed on the ADC digital input/output lines to allow operation with low-voltage
controllers, such as the MSP430. The supply voltage to these buffers is determined by JMP3 or the
voltage applied to TP7.
SBAU140A – December 2008 – Revised February 2016
Submit Documentation Feedback
Table 4. J3 Pinout
Signal
Unused
Unused
+5VA
Unused
DGND
Copyright © 2008–2016, Texas Instruments Incorporated
Pin Number
6
7
8
9
10
MSOP-8EVM and MSOP-8EVM-PDK
Power Supplies
Signal
AGND
+1.8VD
+VD1
+3.3VD
+5VD
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MSOP-8EVM-PDK and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Msop-8evm

Table of Contents