www.ti.com
6.4
Running the Software and Completing Driver Installation
NOTE: The software is continually under development. These instructions and screen images are
current at the time of this writing, but may not exactly match future releases.
The program for evaluating the MSOP-8EVM-PDK is called ADCPro. This program uses plug-ins to
communicate with the EVM. The MSOP-8EVM-PDK plug-in is included in the MSOP-8EVM-PDK package.
The program currently runs only on Windows XP.
Follow these procedures to run ADCPro and complete the necessary driver installation:
Step 1. Start the software by selecting ADCPro from the Windows Start menu. The screenshot shown
in
Figure 7
SBAU140A – December 2008 – Revised February 2016
Submit Documentation Feedback
appears.
Figure 7. ADCPro Software Start-up Display Window
Copyright © 2008–2016, Texas Instruments Incorporated
MSOP-8EVM-PDK Kit Operation
MSOP-8EVM and MSOP-8EVM-PDK
13
Need help?
Do you have a question about the MSOP-8EVM-PDK and is the answer not in the manual?
Questions and answers