Found New Hardware Wizard, Screen 5 - Texas Instruments MSOP-8EVM-PDK User Manual

Hide thumbs Also See for MSOP-8EVM-PDK:
Table of Contents

Advertisement

www.ti.com
Step 6. When Windows installs the software driver, the plug-in downloads the firmware to the MMB0.
Step 7. Windows will display the installation wizard a second time. Again, accept the default settings.
Step 8. The status area displays a connected message. The software is now ready to use.
The driver installation wizard sequence should not appear again, unless you connect the board to a
different USB port.
SBAU140A – December 2008 – Revised February 2016
Submit Documentation Feedback
Figure 13. Found New Hardware Wizard, Screen 5
Copyright © 2008–2016, Texas Instruments Incorporated
MSOP-8EVM-PDK Kit Operation
MSOP-8EVM and MSOP-8EVM-PDK
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MSOP-8EVM-PDK and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Msop-8evm

Table of Contents