Seagull Models SEA230B Assembly Manual page 24

Bee version
Table of Contents

Advertisement

Skyraider
WARBIRD 10cc-15cc
Horizontal
Stabilizer.
When you are sure that everything is
aligned correctly, mix up a generous
amount of Flash 30 Minute Epoxy. Ap-
ply a thin layer to the mounting slot
and to bottom of the vertical stabilizer
mounting area. Apply epoxy to the bot-
tom and top edges of the filler block and
to the lower hinge also. Set the stabilizer
in place and realign. Double check all of
your measurements once more before
the epoxy cures. Hold the stabilizer in
place with T-pins or masking tape and
remove any excess epoxy using a paper
towel and rubbing alcohol. Allow the
epoxy to fully cure before proceeding.
24
Vertical
Stabilizer.
90º
ELEVATOR PU SHROD HORN
INSTALLATION.
1) Locate items necessaryto install rud-
der pushrod.
2) Install the elevator control horn using
the same method as with the aileron con-
trol horns.
3) Position the elevator control horn on
the both side of elevator.
Elevator control horn.
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the
horns on until they are flush with the
ends of the control rods.
4) Elevator and rudder pushrods assem-
bly as pictures below.
M2 clevis.
M2 lock nut.
M2 clevis.
Fuel tubing.
Hex nut.
Instruction Manual.
Cut.
Elevator pushrod.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Skyraider warbird 10cc

Table of Contents