3.1 Terminal Block Connector Pinout
To install the 3-pin Terminal Block Connector on the Wall-mount Managed Switch,
simply follow the following steps:
Step 1: Insert positive DC power wire into V+, negative DC power wire into V-,
and grounding wire into Ground.
Step 2: Tighten the wire-clamp screws for preventing the wires from loosening
and plug into the Wall-mount Managed switch.
1. The wire gauge should be in the range from 12 to 24 AWG.
2. The device must be grounded.
Note
3.2 DC Power Jack
The
WGS-804HPT/WGS-4215-8P2S/WGS-4215-16P2S
power input and WGS-4215-8T/WGS-4215-8T2S requires DC 12~48V power input.
Should you have the issue of power connection, please contact your local sales
representative.
2.1mm
DC Receptacle 2.1mm
DC receptacle is 2.1mm wide that conforms to the WGS-4215 series 2.1mm
DC jack's central post. Do not install any improper power adaptor
6
Ground
V
-
V+
requires
DC
48V~56V