Terminal Block Connector Pinout; Wiring Completed In Three Steps - Planet WGS-6325-8UP2X User Manual

Industrial wall-mount managed gigabit ethernet switch
Table of Contents

Advertisement

PWR1 and PWR2 must provide exactly the same DC voltage
for power load balance while operating with dual power input.

4.1 Terminal Block Connector Pinout

The Front Panel of the Wall-mount Managed Switch consists of one spring
terminal block connector within 4 contacts. Please follow the steps below to
insert the power wire.
Insert positive/negative DC power wires into Contacts V1+ and V1- for Power
1, or Contacts V2+ and V2- for Power 2.

4.2 Wiring Completed in Three Steps

Step 1: Press the flat-blade screwdriver diagonally into the release hole.
Step 2: Leave the flat-blade screwdriver pressed into the release hole and
insert the wire into the terminal hole. Insert the wire until the
stripped portion is no longer visible to prevent shorting.
Step 3: Remove the flat-blade screwdriver from the release hole. After you
connect the wires, pull gently on the wire to make sure that it will
not come off and the wire is securely fastened to the terminal block.
Wire
Flat-blade screwdriver
V2
V2+
V1
V1+
PWR 2
PWR 1
9

Advertisement

Table of Contents
loading

Table of Contents