Hardware Installation; Wall Mount Installation - Planet WGS-4215-8P2S Quick Installation Manual

Industrial wall-mount managed ethernet switch
Hide thumbs Also See for WGS-4215-8P2S:
Table of Contents

Advertisement

4. Hardware Installation

4.1 Wall Mount Installation

To install the Wall-mount Managed Switch on the wall, simply follow the following
steps:
Step 1: It is required 4 holes with 8mm diameter on the wall; the distance
between the 2 holes is 133mm (WGS-804HPT/WGS-4215-8T), 163mm
(WGS-4215-8T2S/WGS-4215-8P2S), 230 mm (WGS-4215-16P2S) and the
line through them must be horizontal.
Step 2: Install a conductor pipe inside the board hole and flush the edge of the
conductor pipe with the wall surface.
Step 3: Screw the bolts into the conductor pipe. The Wall-mount Managed Switch
is between bolts and conductor pipe, as shown below.
Distance (mm)
W
D
Vary on model
8-port
133
118
W
D
8+2S
16+2S
163
118
230
124
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wgs-4215-8tWgs-4215-8t2sWgs-804hptWgs-4215-16p2s

Table of Contents