4.1 Terminal Block Connector Pinout
The Front Panel of the Wall-mount Managed Switch consists of one spring
terminal block connector within 4 contacts. Please follow the steps below to
insert the power wire.
Insert positive/negative DC power wires into Contacts V1+ and V1- for Power 1, or
Contacts V2+ and V2- for Power 2.
4.2 Wiring Completed in Three Steps
Step 1: Press the flat-blade screwdriver diagonally into the release hole.
Step 2: Leave the flat-blade screwdriver pressed into the release hole and insert
the wire into the terminal hole.
Step 3: Remove the flat-blade screwdriver from the release hole.
After you connect the wires, pull gently on the wire to make sure that it
will not come off and the wire is securely fastened to the terminal block.
Wire
Flat-blade screwdriver
8
V1
PWR 1
V1+
V2
PWR 2
V2+
Dua l pow
V 1
er inpu t
for max
is requ ired
imu m PoE
load ing.
V1
PW R 1
V1+
V2
V 1 +
PW R 2
V2+
DC Inpu
t Ran ge
48-5 4V
, 8A max
.
V 2
Sm art LC
V 2 +
Fib er
100 0
WG S-52
LNK /AC
1
25- 8UP
10/1 00
T
2
2SV
LNK /AC
T
3
bt PoE -in-U
se
4
at PoE -in-U
se
Max . Fau
lt Alar m
Loa ding
: 24V , 1A
D
PW R 1
PW R 2
Ring
Ma na ged
R.O .
1G/2 .5G
LNK
100
ACT
9
LNK
ACT
SFP
5
10
6
7
8
PoE ++
SFP
9
10