Cable Assembling - B+B Sensors DM-Compact Series Operating Manual

Table of Contents

Advertisement

OPEARTING MANUAL
4.1.5

Cable Assembling

The cable gland M12x1,5 allows the use of cables with a diameter of 3 to 5
mm. Remove the isolation from the cable (40 mm power supply, 50 mm signal
outputs, 60 mm functional inputs). Cut the shield down to approximately 5 mm
and spread the strands out. Extract about 4 mm of the wire isolation and tin the
wire ends.
Place the pressing screw, the rubber washer and the metal washers of the
cable gland one after the other onto the prepared cable end. Spread the
strands and fix the shield between two of the metal washers. Insert the cable
into the cable gland until the limit stop. Screw the cap tight.
Every single wire may be connected to the according screw clamps according
to their colors
Use shielded cables only. The sensor shield has to be grounded.
B+B Thermo-Technik GmbH | Heinrich-Hertz-Str. 4 | D-78166 Donaueschingen
Technische Änderungen vorbehalten
Fon +49 771 83160 | Fax +49 771 831650 | info@bb-sensors.com | bb-sensors.com
54 / 88
0141 0315-100
17.08.2015

Advertisement

Table of Contents
loading

Related Products for B+B Sensors DM-Compact Series

This manual is also suitable for:

LtLtfLth1m2m3m ... Show all

Table of Contents