Step 2 Check that the cable length is appropriate.
Step 3 Check that the cables around the connectors are not twisted.
Step 4 Check that cables are routed as required.
Step 5 Check that the power cables, multi-port cables, and network cables are properly
connected. For details, see
Table 4-5 Cable connection checklist
Item
Power cables
Multi-port cables
Network cables
----End

4.6.3 Powering On the Chassis

Scenario
Devices and cables are properly installed.
Procedure
Step 1 Switch on the AC power distribution box (PDB) that corresponds to the power
cable of the chassis.
Step 2 Switch on the busbar of the cabinet.
Step 3 Observe the status of chassis indicators.
The chassis is properly powered on if the following indicators are steady green:
----End

4.6.4 Checking Device Operating Status

Procedure
Step 1 Power on the chassis. For details, see
Issue 04 (2020-06-05)
Description
● All power cables are properly connected to power
● Power cables are securely connected.
● Multi-port cables are properly connected to the
● Multi-port cables are securely connected.
Network cables are correctly connected to the specified
management or service network port.
Operating status indicator on each PSU
Power indicator on the server front panel
Copyright © Huawei Technologies Co., Ltd.
Table
4-5.
supply units (PSUs).
universal connector ports on server nodes.
4.6.3 Powering On the
4 Installing the X6000
Chassis.
57