Huawei TaiShan X6000 User Manual page 50

Hide thumbs Also See for TaiShan X6000:
Table of Contents

Advertisement

TaiShan X6000 Server
User Guide
3.
Issue 04 (2020-06-05)
Figure 4-12 Installing an inner rail
Lift the server, align the inner rails with the holding rails, and push the server
into the cabinet, as shown in
At least three people are required to lift the server from both sides.
Copyright © Huawei Technologies Co., Ltd.
Figure
4-13.
4 Installing the X6000
43