Changing The Configuration Of Deployed Paragon Switches In Pcci; Changing The Configuration Of User Stations, Ip-Reach Units And Ust-Ips; Figure 39 Paragon Ii Front Panel Buttons - Raritan Paragon II Deployment Manual

Table of Contents

Advertisement

54
Changing
the
switches in PCCI
To make any changes to the physical configuration of Paragon switches in your PCCI setup
(including adding, removing, re-organizing and replacing Paragon switches), Raritan
recommends powering down your Paragon setup.
1. Power down the Paragon side of your PCCI setup, including the P2SC.
2. Make whatever changes required to the physical setup of your Paragon deployment.
rd
3. If you have any 3
Tier Paragon switches, power on all 3
4. Perform a partial reset on all 3
this:
ESC
FUNC
a. Hold the
and
pressing the FUNC button.
b. When the front panel stops scrolling, release the
c. When "Clear Database Hit Ent/ESC?" appears on the LCD, release the FUNC button.
d. Press the ENT button to initiate a database reset (or press the ESC button if you want to
exit the screen without resetting).
e. When "Clear All?" appears on the LCD, press the ESC button to perform a partial reset.
The channel configuration will be cleared and will be rebuilt later by the Paragon switch.
Important: When "Clear All?" appears on the LCD, do NOT press the ENT
button. Doing so will perform a full factory reset, clearing all configuration
data and returning the unit to a new from the factory state.
rd
5. After all 3
Tier Paragon switches have been reset, power on all 2
6. Repeat Step 4 for all 2
7. After all Upper Tier Paragon switches have been reset, power on all Base Tier Paragon
switches.
8. Repeat Step 4 for all Base Tier Paragon switches.
9. Power on all UST1s, IP-Reach units and USTIP units.
10. Power on any Paragon II System Controllers that were shut down.
Changing the Configuration of User Stations, IP-Reach
Units and UST-IPs
You can add, remove, change or replace any of these components without having to power down
your Paragon deployment. Modify your USTs, IP-Reach units or USTIPs any way you wish and
then power cycle just that device after it has been connected to your PCCI deployment.
After Powering On your UST, IP-Reach or USTIP, it may be a few minutes before P2SC detects
the change.
P
II / C
ARAGON
OMMAND
Configuration
rd
Tier Paragon switches after they have powered on. To do

Figure 39 Paragon II Front Panel Buttons

buttons on the front panel of the Paragon II unit simultaneously while
nd
Tier Paragon switches.
C
I
S
ENTER
NTEGRATION
OLUTIONS
of
Deployed
rd
Tier Paragon switches first.
and
buttons.
nd
Tier Paragon switches.
D
G
EPLOYMENT
UIDE
Paragon
ENT

Advertisement

Table of Contents
loading

Table of Contents