INTRODUCTION
To the Dealer
This instruction contains important information for
unloading of the 1tRIPr® II Row Unit. Read instructions
carefully before attempting to unload. While the 1tRIPr®
II is considered a factory assembled product, some
components may have been removed from the machine
to prevent damage during shipping, or to allow for
consolidated shipments. Make sure all components are
properly installed.
Inspect the implement thoroughly after assembly to be
certain it is functioning properly before delivering it to the
customer. The following checklist is a reminder of points
to cover. Check off each item as it is found satisfactory or
after proper adjustment is made.
Delivery
At the time the machine is delivered, the following
checklist is a reminder of information which should be
conveyed directly to the customer. Check off each item
as it is fully explained to customer.
Introduce the machine to the customer. Give the customer the operator's manual and encourage them to read it.
Make the customer aware of all the safety precautions that must be exercised when using and transporting the machine.
Make customer aware of the different tooling options available.
The machine does not come set to run in the field from the factory. See Chapter 5, "Operation and Field Settings" to help
set the machine for optimal performance. Explain all operating adjustments.
Explain to the customer that the life expectancy of this machine depends on regular maintenance as directed in the
operator's manual.
Tell the customer to use the proper tools for service and inform them of Orthman parts availability.
Review recommended procedures for attaching and detaching implement from tractor.
Inform the customer of safety precautions that must be observed when transporting.
When the machine is transported on a road or highway at night or during the day, accessory lights and devices should be
used for adequate warning to operators of other vehicles. In this regard, tell customer to check local governmental
regulations.
Write machine model number and serial number in the spaces provided below.
To the best of my knowledge, this machine has been delivered ready for field use and the customer has been fully informed
as to proper operation and care.
Date delivered:
Signature:
NOTE: After signing, copy this page. Keep signed delivery
checklist in machine file at the dealership.
All hardware is properly tightened.
Lubrication of grease fittings has been completed.
All decals are properly located and readable.
All implement tools and options are installed and set.
Check overall condition of implement.
Make sure operator's manual is included.
Date set up:
Signature:
Delivery Checklist
Model number:
Serial number:
1-2
Pre-Delivery Checklist
1TRIPR II Row Units OM-EN
Need help?
Do you have a question about the 1TRIPR II ROW UNITS and is the answer not in the manual?
Questions and answers