Orthman 1TRIPR II ROW UNITS Operator's Manual

Orthman 1TRIPR II ROW UNITS Operator's Manual

Hide thumbs Also See for 1TRIPR II ROW UNITS:
Table of Contents

Advertisement

Quick Links

1TRIPR II ROW UNITS
Operator's Manual
Part #125-082-01-EN-OM
Rev. A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1TRIPR II ROW UNITS and is the answer not in the manual?

Questions and answers

Summary of Contents for Orthman 1TRIPR II ROW UNITS

  • Page 1 1TRIPR II ROW UNITS Operator’s Manual Part #125-082-01-EN-OM Rev. A...
  • Page 2 Intentionally Left Blank Page...
  • Page 3: Table Of Contents

    Orthman Right Side Decals ........
  • Page 4 Automatic Reset (AR) Trip Linkage ..........5-21 1TRIPR II Row Units OM-EN...
  • Page 5 Notes ............... . 7-8 1TRIPR II Row Units OM-EN...
  • Page 6 Page Intentionally Blank 1TRIPR II Row Units OM-EN TOC-iv...
  • Page 7 Warranty ..............1-4 1TRIPR II Row Units OM-EN...
  • Page 8: Introduction

    Explain to the customer that the life expectancy of this machine depends on regular maintenance as directed in the operator’s manual. Tell the customer to use the proper tools for service and inform them of Orthman parts availability. Review recommended procedures for attaching and detaching implement from tractor.
  • Page 9: Product Description

    INTRODUCTION Product Description Purpose of This Manual The Orthman 1tRIPr® II Row Unit preplant tillage tool This manual is considered to be an integral component of combines the following three principals of successful the 1tRIPr® II Row Units and is designed to educate the...
  • Page 10: Warranty

    INTRODUCTION Warranty Orthman Manufacturing, Inc. ("OMI") warrants each new OMI obligation under this warranty shall be limited to whole good product to be free from defects in repairing or replacing, free of charge to the purchaser, manufactured components and workmanship. This...
  • Page 11: Safety Information

    Orthman Right Side Decals ........
  • Page 12: Farm Safety

    • Review and follow instructions in material safety data sheets (MSDSs) and on labels that come with Orthman Manufacturing provides this document in the chemical products and communicate information on hope that everyone that has a job to do, does it SAFELY.
  • Page 13: Health And Safety Hazards On Farms

    Electrocution, “struck by” injuries, or death Move to a safe place. Lightening, hail, and tornadoes are unpredictable. Orthman Manufacturing, Inc. does not limit the potential effects or injuries nor prevention measures to those listed above. They are provided solely as a guideline to making your farm life safer.
  • Page 14: Safety Alert Symbol

    WARNING indicates a potentially hazardous situation Read and understand all operator manuals for the that, if not avoided, could result in death or serious machinery used in conjunction with Orthman injury. WARNING includes hazards that are exposed equipment. when safety guards are removed. WARNING may also be used to alert against unsafe practices.
  • Page 15: Equipment Safety Guidelines

    Safe Operation Operator safety is the primary concern when designing CAUTION an Orthman implement. Orthman integrates as many safety features into the implement as possible. You can Read and understand the entire contents of this manual avoid many hazards and possible accidents by observing before operating or servicing the implement.
  • Page 16: Warning And Safety Lights

    Make sure all warning lights, safety lights, and turning front and rear of the implement. signals are working and clean. Replace missing or • Orthman double bar toolbar is shown. Orthman rigid damaged lights immediately. Comply with state and local toolbar is similar.
  • Page 17: Slow Moving Vehicle (Smv)

    The SMV placard is highly reflective and must be mounted to the implement where it is easily visible to other motorists when the implement is in motion. NOTE: Orthman rigid toolbar is shown. Orthman double bar toolbar is similar. ORM000297 Figure 2-2...
  • Page 18: Practice Safe Maintenance

    Always place the tractor in park and turn off the engine before connecting or disconnecting the implement. Injury or death can result from being trapped between the tractor and implement. 1TRIPR II Row Units OM-EN...
  • Page 19: Anhydrous Ammonia (Nh3) And Liquid Fertilizer

    The serial number plate can be found on the result in death or serious injury. Orthman toolbar, and is usually located at the end of the wing or on the wing fold linkage. Use extreme care when working with anhydrous ammonia (NH3) and liquid fertilizer.
  • Page 20: Safety Decals

    SAFETY INFORMATION Safety Decals See the Orthman toolbar operator manual for proper placement of safety decals. Safety decals promote awareness and knowledge NOTE: Replacement decals are available from your concerning safe operation and maintenance of the Orthman dealer. When replacing decals, implement.
  • Page 21: Orthman Left Side Decals

    SAFETY INFORMATION Orthman Left Side Decals NOTE: Orthman double bar toolbar is shown. Orthman rigid toolbar is similar. C A U T I O N 1. Read and understand all operator manuals before implement use. 2. Follow all tractor or towing device operating procedures and safety guidelines.
  • Page 22 SAFETY INFORMATION Page Intentionally Blank 1TRIPR II Row Units OM-EN 2-12...
  • Page 23: Major Components

    Coastal Plains Roller Assembly ........... . 3-5 1TRIPR II Row Units OM-EN...
  • Page 24: Main Frame

    The floating row cleaner assembly is similar. ORM000251 Figure 3-1 1) Toolbar mount 5) Main frame 2) Parallel linkage (2 used) 6) Row cleaner assembly 3) Down pressure spring (2 used) 7) Scraper 4) Shear bolt 8) Depth band coulter assembly 1TRIPR II Row Units OM-EN...
  • Page 25: Tail Section

    1.5 inch boot, shallow tillage shank, mole knife shank, and AA knife shank assemblies are similar. ORM000252 Figure 3-2 1) Auto-reset (AR) trip linkage (optional) 3) Tail section 2) Tillage shank assembly 4) Wavy coulter assembly 1TRIPR II Row Units OM-EN...
  • Page 26: Rolling Basket Assembly

    NOTE: The 14 inch berm-promoting rolling basket is shown. The 14 inch standard, 8 inch narrow standard, and 10 inch vertical tillage rolling baskets are similar. ORM000058 Figure 3-3 1) Spring 2) Basket frame 3) Basket 1TRIPR II Row Units OM-EN...
  • Page 27: Coastal Plains Roller Assembly

    Coastal Plains Roller Assembly NOTE: The 12.5 inch coastal plains roller is shown. The 20 inch coastal plains roller is similar. ORM000255 Figure 3-4 1) Turnbuckle 3) Scraper 5) Guard 2) Roller frame 4) Roller 1TRIPR II Row Units OM-EN...
  • Page 28 MAJOR COMPONENTS Page Intentionally Blank 1TRIPR II Row Units OM-EN...
  • Page 29 Automatic Reset (AR) Trip Linkage Installation ........4-17 1TRIPR II Row Units OM-EN...
  • Page 30: Shipping Configuration

    “Implement Storage” on page 7-4. tillage shank assembly foot piece. ORM000256 Figure 4-1 1) Depth band coulter 2) Row cleaner assembly 3) Tillage shank assembly 4) Wavy coulter assembly assembly 1TRIPR II Row Units OM-EN...
  • Page 31: Preparing The 1Tripr® Ii Row Unit

    2. Make all necessary tooling adjustments prior to field are clear of the implement before lowering. use. See “Field Adjustments” on page 5-4. 3. If an Orthman toolbar is used in conjunction with DANGER 1tRIPr® II Row Units, be sure to consult the toolbar operator’s manual before attempting to operate the...
  • Page 32: Tooling Options

    Use bar stands and cylinder stops to support the implement. 1. Lower the implement to the ground, place the tractor in park, turn off the engine, and remove the key. 1TRIPR II Row Units OM-EN...
  • Page 33 PREPARATION AND SETUP ORM000257 Figure 4-2 1) Wedge bolt 3) Mount 5) Parallel linkage (2 used) 7) Toolbar 2) Locking nut (4 used) 4) U-bolt (2 used) 6) Row unit 8) Wedge 1TRIPR II Row Units OM-EN...
  • Page 34: Row Unit Set-Back Clamp

    (5) to set the hole to hole distance of 14 in (35.7 cm) (6). 6. Tighten set-back clamp bolts and adjustment bolts to proper torque. See “Torque Specifications” on page 7-2. 7. Install row unit parallel linkage (2) to set-back clamp. 1TRIPR II Row Units OM-EN...
  • Page 35 PREPARATION AND SETUP ORM00528 Figure 4-3 1) Set-back clamp 3) Adjustment bolt (2 used) 5) Washer (as needed) 2) Parallel linkage (2 used) 4) Bolt (6 used) 6) Hole distance of 14 in (35.7 cm) 1TRIPR II Row Units OM-EN...
  • Page 36: Rolling Basket Assembly

    Contact your 6. Remove cotter pins (7) and pin (6) from the spring Orthman dealer for lift assist wheel extension assembly (3). package information to alleviate clearance issues.
  • Page 37: Tillage Shank

    Depth Adjustment Chart” on page 5-12. ORM000275 Figure 4-5 1) Roll pin 3) Shank 2) Height adjustment hole 4) Wavy coulter (2 used) (11 used) For tillage shank depth settings, see “Tillage Shank Depth Adjustment Chart” on page 5-12. 1TRIPR II Row Units OM-EN...
  • Page 38: Mole Knife Assembly

    4) Fertilizer knife clamp (2 used) (2 used) For tillage shank depth settings, see “Tillage Shank For tillage shank depth settings, see “Tillage Shank Depth Adjustment Chart” on page 5-12. Depth Adjustment Chart” on page 5-12. 1TRIPR II Row Units OM-EN 4-10...
  • Page 39: Dry Mole Shank Assembly

    For liquid fertilizer tube and dry boot adjustments, see “Adjustable Liquid Tubes” on page 5-18 and see “Adjustable Dry Fertilizer Boot on Dry Mole Shank” on page 5-19. For tillage shank depth settings, see “Tillage Shank Depth Adjustment Chart” on page 5-12. 1TRIPR II Row Units OM-EN 4-11...
  • Page 40: Tillage Shank Installation

    2) Jam nut (2 used) 5) Roll pin 3) Set bolt (2 used) 6) Tillage shank 5. Remove hair pin (1) and pin (4). For tillage shank depth settings, see “Tillage Shank Depth Adjustment Chart” on page 5-12. 1TRIPR II Row Units OM-EN 4-12...
  • Page 41: Mole Shank Assembly Fertilizer Tube Installation

    See “Implement Inspection” ORM000278 Figure 4-13 on page 7-4. 1) Fertilizer tube (2 used) 4) Roll pin hole (10 used) 2) Roll pin (3 used) 5) Mount tab (2 used) 3) Side plate (2 used) 1TRIPR II Row Units OM-EN 4-13...
  • Page 42: Mole Knife Assembly Fertilizer Tube Installation

    3. Remove buildup of grease, oil, and debris prior to 1) Fertilizer tube 4) Roll pin (2 used) installing fertilizer tubes. See “Implement Inspection” 2) Side plate (2 used) 5) Mount tab on page 7-4. 3) Roll pin hole (3 used) 1TRIPR II Row Units OM-EN 4-14...
  • Page 43: Dry Mole Shank Assembly Fertilizer Tube And Dry Boot Installation

    3) Fertilizer tube 6) Roll pin (3 used) 4) Mount tab (2 used) 7) Roll pin hole (11 used) 5) Fertilizer boot 8) Mount tab 11. Install side plate and screws, see Figure 4-15. 1TRIPR II Row Units OM-EN 4-15...
  • Page 44: Mole Shank Shin Cap Installation

    3. Remove upper roll pin (1) from foot piece (2). ORM000282 Figure 4-18 2) Foot piece 6) Nut 3) Bolt 7) Shank 4) Washer (2 used) 8) Foot piece ear 5) Shin cap ORM000281 Figure 4-17 1) Roll pin 2) Foot piece 1TRIPR II Row Units OM-EN 4-16...
  • Page 45: Automatic Reset (Ar) Trip Linkage Installation

    DANGER Installation Avoid crushing. Failure to follow this information will One of the most innovative Orthman 1tRIPr® II Row Unit result in death or serious injury. Use an appropriate accessories is the automatic reset (AR) trip linkage. This lifting device to support the tail section.
  • Page 46 12. Insert pin (13) and spring pins (11). result in serious injury. 13. Align springs and insert bolts (12). 15. Tighten spring tension bolts to factory settings. See “Automatic Reset (AR) Trip Linkage” on page 5-21. 1TRIPR II Row Units OM-EN 4-18...
  • Page 47: Operation And Field Settings

    Automatic Reset (AR) Trip Linkage ..........5-21 1TRIPR II Row Units OM-EN...
  • Page 48: Toolbar Height And Orientation

    30-32 in (76-81 cm) above the ground surface. For more information, see the toolbar’s operator manual. 1TRIPR II Row Units OM-EN...
  • Page 49 OPERATION AND FIELD SETTINGS ORM000260 Figure 5-1: Parallel Linkage ORM000261 Figure 5-2: Angled Linkage 1) Approximate height of 30–32 in (76–81 cm) 2) Bottom of toolbar 3) Top of toolbar 4) Ground surface 1TRIPR II Row Units OM-EN...
  • Page 50: Field Adjustments

    “Wavy Coulter Assembly Fore and Aft” on page 5-16. • Adjust rolling basket down pressure. See “Rolling Basket Down Pressure” on page 5-11. • Adjust automatic reset (AR) linkage. See “Automatic Reset (AR) Trip Linkage” on page 5-21. 1TRIPR II Row Units OM-EN...
  • Page 51: Row Unit Down Pressure Adjustment

    Turn counterclockwise (CCW) to decrease the spring tension, reducing the row unit down pressure. 5. Tighten jam nut against spring plug and torque to specification. See “Torque Specifications” on page 7-2. 1TRIPR II Row Units OM-EN...
  • Page 52: Row Cleaner Assembly Depth

    1. Lower the implement to the ground, place the tractor in park, turn off the engine, and remove the key. 2. Remove buildup of grease, oil, and debris prior to adjusting row cleaner assembly depth. See “Implement Inspection” on page 7-4. 1TRIPR II Row Units OM-EN...
  • Page 53 OPERATION AND FIELD SETTINGS ORM000286 Figure 5-4 1) Depth adjustment pin 3) Jam nut 5) Row cleaner assembly 2) Hairpin 4) Set bolt 6) Depth setting 1TRIPR II Row Units OM-EN...
  • Page 54: Row Cleaner Assembly Width

    Use bar stands and cylinder stops to support the implement. 1. Lower the implement to the ground, place the tractor in park, turn off the engine, and remove the key. 1TRIPR II Row Units OM-EN...
  • Page 55: Rigid Row Cleaner

    OPERATION AND FIELD SETTINGS Rigid Row Cleaner ORM000287 Figure 5-5 1) Snap ring 3) O-ring 5) Row cleaner disc 7) Bushing 9) Nut 2) Cap 4) Bolt 6) Bushing 8) Washer 10) Width setting 1TRIPR II Row Units OM-EN...
  • Page 56: Floating Row Cleaner

    OPERATION AND FIELD SETTINGS Floating Row Cleaner ORM000299 Figure 5-6 1) Snap ring 3) Bolt 5) Bushing 7) Nut 2) Cap 4) Row cleaner disc 6) Washer 8) Width setting 1TRIPR II Row Units OM-EN 5-10...
  • Page 57: Rolling Basket Down Pressure

    2. Remove buildup of grease, oil, and debris prior to adjusting rolling basket down pressure. See 1) Hex nut 4) Washer “Implement Inspection” on page 7-4. 2) Jam nut 5) Spring 3) Tension nut 6) Rolling basket 1TRIPR II Row Units OM-EN 5-11...
  • Page 58: Tillage Shank Assembly Depth

    Use bar stands and cylinder stops to support the implement. 1. Lower the implement to the ground, place the tractor in park, turn off the engine, and remove the key. 1TRIPR II Row Units OM-EN 5-12...
  • Page 59 OPERATION AND FIELD SETTINGS ORM000285 Figure 5-8 1) Tillage shank assembly 3) Jam nut (2 used) 5) Depth adjustment pin 2) Set bolt (2 used) 4) Hairpin 6) Depth setting 1TRIPR II Row Units OM-EN 5-13...
  • Page 60: Wavy Coulter Assembly Depth And Width

    2) Set bolt (2 used) 4) Depth setting adjusting wavy coulter assembly depth and width. See “Implement Inspection” on page 7-4. CAUTION Be extremely careful working around unshielded sharp edges. Injury may result from contact with sharp edges. 1TRIPR II Row Units OM-EN 5-14...
  • Page 61: Wavy Coulter Assembly Width Adjustment

    3. Tighten nuts to specification. See “Torque Specifications” on page 7-2. ORM000288 Figure 5-10 1) Width setting (2 used) 2) Bolt (2 used) 3) Wavy coulter disc assembly (2 used) 4) Nut (2 used) 1TRIPR II Row Units OM-EN 5-15...
  • Page 62: Wavy Coulter Assembly Fore And Aft

    Use bar stands and cylinder stops to support the implement. 1. Lower the implement to the ground, place the tractor in park, turn off the engine, and remove the key. 1TRIPR II Row Units OM-EN 5-16...
  • Page 63 OPERATION AND FIELD SETTINGS ORM000290 Figure 5-11 1) Snap ring 3) Bolt 5) Spacer 7) Nut 2) Cap 4) Left wavy coulter assembly disc 6) Lock washer 8) Fore and aft setting 1TRIPR II Row Units OM-EN 5-17...
  • Page 64: Adjustable Liquid Tubes

    NH3 or liquid fertilizer. Refer recognized sources. See “Anhydrous Ammonia (NH3) and Liquid Fertilizer” on page 2-9. The Orthman 1tRIPr® II Mole Shank Assembly can be used to place fertilizer at two different depths simultaneously. Depending on the fertilizer setup, it could...
  • Page 65: Adjustable Dry Fertilizer Boot On Dry Mole Shank

    NH3 or liquid fertilizer. Refer recognized sources. See “Anhydrous Ammonia (NH3) and Liquid Fertilizer” on page 2-9. The Orthman 1tRIPr® II Mole Shank Assembly can be used to place fertilizer at two different depths simultaneously, one of those options being dry fertilizer.
  • Page 66: Shear Bolt Protected Tail

    NOTE: If the shear bolt is damaged, the operator should not have an excessive clamping load. stop and replace the bolt. Orthman recommends using a grade 5 bolt for replacement. Higher or lower grade bolts may result in poor performance and cause damage to the implement.
  • Page 67: Automatic Reset (Ar) Trip Linkage

    The AR trip linkage may help, but will not prevent damage from occasional glancing blows. ORM000270 Figure 5-16 1) Row unit tail 3) Wavy coulter (2 used) 5) Reset spring (4 used) 2) Shank 4) Basket 6) Rock 1TRIPR II Row Units OM-EN 5-21...
  • Page 68 (14). See Figure 5-18 on page 5-23. NOTE: It may only be necessary to move the set bolt 1/8 in (0.32 cm) to 1/4 in (0.64 cm) to achieve the correct offset distance for the soil and desired tripping operation. 1TRIPR II Row Units OM-EN 5-22...
  • Page 69 (3885 kg) (4054 kg) (4392 kg) Orthman Manufacturing encourages the operator to start out at the factory setting, where the row unit tail will trip very easily. From that point adjust the set bolt and spring tension to attain the desired AR trip linkage setting.
  • Page 70 OPERATION AND FIELD SETTINGS Page Intentionally Blank 1TRIPR II Row Units OM-EN 5-24...
  • Page 71: Troubleshooting

    Shear Bolt Will Not Shear or Shears Too Easily........6-3 1TRIPR II Row Units OM-EN...
  • Page 72: Row Unit Tooling Does Not Penetrate Soil. Wing Row Units Float Upward

    • Alter ground speed to change rate at which field residue passes through row unit tooling. Slower ground speeds generally reduce plugging by allowing residue to pass smoothly through row unit tooling. 1TRIPR II Row Units OM-EN...
  • Page 73: Field Residue Plugs Between Row Units

    Coulter Assembly Depth and Width” on page 5-14. • Increase distance between tillage shank assembly and wavy coulter assembly. See “Wavy Coulter Assembly Fore and Aft” on page 5-16. • Adjust row cleaner width. See “Row Cleaner Assembly Width” on page 5-8. 1TRIPR II Row Units OM-EN...
  • Page 74 TROUBLESHOOTING Page Intentionally Blank 1TRIPR II Row Units OM-EN...
  • Page 75: Maintenance And Specifications

    Notes ............... . 7-8 1TRIPR II Row Units OM-EN...
  • Page 76: Practice Safe Maintenance

    Make sure fastener threads are clean and that you 1/4 to 3/4 in. fasteners with JDM F13B zinc flake coating. properly start thread engagement. When possible, lubricate plain or zinc plated fasteners other than lock nuts, wheel 1TRIPR II Row Units OM-EN...
  • Page 77: Metric Fasteners

    M20 and larger fasteners with JDM F13C zinc flake coating. “Dry” means plain or zinc plated without any lubrication, or M6 to M18 fasteners with JDM F13B zinc flake coating. 1TRIPR II Row Units OM-EN...
  • Page 78: Lubrication

    The purpose of lubrication on machines with moving • Clean and touch up paint seasonally to avoid parts is to prevent metal-on-metal contact. corrosion and rust. Contact your Orthman dealer for touch up paint. Metal-on-metal contact creates premature wearing of the connective components.
  • Page 79: Specifications

    30 in (76.2 cm) 7591 lb (3443 kg) 20.1 ft (6.1 m) 22 in (50.8 cm) 8650 lb (3924 kg) 22.8 ft (6.9 m) 30 in (76.2 cm) 9200 lb (4173 kg) 30.1 ft (9.2 m) 1TRIPR II Row Units OM-EN...
  • Page 80 38–40 in (96.5–101.6 cm) 10155 lb (4606 kg) 21.3 ft (7.1 m) 30 in (76.2 cm) 12368 lb (5610 kg) 21.7 ft (7.2 m) 38–40 in (96.5–101.6 cm) 15764 lb (7150 kg) 28.1 ft (9.4 m) 1TRIPR II Row Units OM-EN...
  • Page 81 16210 lb (7353 kg) 11.2 ft (3.4 m) XD Combo 30 in (76.2 cm) 18783 lb (8520 kg) 16.2 ft (4.9 m) Machines 30 in (76.2 cm) 24638 lb (11176 kg) 21.3 ft (6.5 m) 1TRIPR II Row Units OM-EN...
  • Page 82: Notes

    MAINTENANCE AND SPECIFICATIONS Notes 1TRIPR II Row Units OM-EN...
  • Page 83 Pre-delivery checklist ....1-2 Shipping configuration ....4-2 1TRIPR II Row Units OM-EN Index-i...
  • Page 84 SMV. See Slow moving vehicle (SMV) Installation ......4-8 1TRIPR II Row Units OM-EN Index-ii...
  • Page 85 Troubleshooting ..... . . 6-2 Width adjustment ..... 5-15 1TRIPR II Row Units OM-EN Index-iii...
  • Page 86 ORTHMAN MFG 75765 Road 435 Lexington, NE 68850 USA Ag Products: 308-324-4654 USA Repair Parts: 866-324-7519 South Africa Ag Products: (+27) 12-940-2155 For repair parts or service contact your certified Orthman dealer. Orthman.com...

This manual is also suitable for:

125-082-01-en-om

Table of Contents

Save PDF