ELECTRICAL INSTALLATION

Grid Connection

The electrical connection is the costumer's responsibility and
should be carried out by a qualified professional.
The Supernova must be connected to an electrical network with the
following specifications: (3P + N + PE): 400/230 V +/- 10%; 50 Hz.
34
ELECTRICAL INSTALLATION
Grid Connection
Material
Assembly
Part
Size
Electrical
5 Screws
M8
Cabinet
1.
Locate the power input access at the bottom of the charging point.
2.
Put the cables through the waterproofing rubber
and anchor back the cable-entry frame.
PE
N
L2 L3
L1
N PE
L2 L3
L1
REMEMBER
In case it is needed, Wallbox recommends to
unscrew the M5 x12 with an Allen Key M5.
Quantity
Tools recommended
PE
5
Hexagon socket wrench
for M8
N
L2 L3
L1
N PE
L2 L3
L1
35