Transport And Unpacking; Transport - Wallbox Supernova Installation Manual

Hide thumbs Also See for Supernova:
Table of Contents

Advertisement

TRANSPORT AND UNPACKING

Transport

A.
B.
C.
16
The base of the charging point will be
screwed to an eu-pallet with two metal
plates held by four M12 nuts. Therefore
any lifting system compatible with the
eu-pallet could be used to lift it, move
it and transport it to the place of the
installation.
REMEMBER
The package should be transported
vertically not to damage Supernova.
To lift the charger, place the forklift with
a capacity greater than 250 kg under the
eu-pallet or directly under the foot of the
charger.
In both cases, the download needs to be
carried out making sure not to damage
the charging point.
IMPORTANT
Make sure that the charger is stable on
the forklift before moving it.
Supernova can be transported also with
a crane. In this specific case, remove the
external top cover and the internal top
cover of the packaging. Then, mount the
eye-bolts on top of the charger. Look at
the "Final Steps" section of this manual
for more information (pg.39)
TRANSPORT AND UNPACKING
Unpacking
1.
Make sure to have enough space to
unpack the charger.
x6 M10x35 Screws shall be unscrewed
from the front and back of Supernova.
DISCLAIMER
Store the Supernova in the original
packaging in a vertical position. Storage
Temperatures: -35 to 70ºC.
2.
Take out the external top cover.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents