Chapter 2: Installing The Tga 2950 - TA Instruments TGA 2950 Operator's Manual

Thermogravimetric analyzer
Table of Contents

Advertisement

CHAPTER 2: Installing the
TGA 2950
TA I
TGA 2950
NSTRUMENTS
Unpacking/Repacking the 2950 ................... 2-3
Unpacking the 2950 .............................. 2-3
Repacking the 2950 ............................... 2-6
Installing the Instrument ............................. 2-7
Inspecting the System........................... 2-8
Choosing a Location ............................ 2-9
Filling the Heat Exchanger................. 2-10
Connecting Cables and Gas Lines ...... 2-12
and Water Lines ........................... 2-12
GPIB Cable .................................. 2-15
Purge Lines .................................. 2-17
Cooling Gas Line ......................... 2-18
Power Cable ................................. 2-19
Unpacking the Balance ............................. 2-20
Installing the Hang-Down Wires .............. 2-22
Hang-Down Wire ............................... 2-25
Adjusting the Sample Platform ................. 2-29
Starting the 2950 ........................................ 2-30
Shutting Down the 2950 ............................ 2-32
2-1

Advertisement

Table of Contents
loading

Table of Contents