Chapter 2:  Installing The Dsc; Unpacking/Repacking The Dsc; Installing The Instrument; Inspecting The System - TA Instruments DSC Q Series Getting Started Manual

Differential scanning calorimeter
Table of Contents

Advertisement

Unpacking/Repacking the DSC

The instructions needed to unpack and repack the instrument are found as separate unpacking instructions in
the shipping box and in the online documentation associated with the instrument control software. You may
wish to retain all of the shipping hardware, the plywood, and boxes from the instrument in the event you wish
to repack and ship your instrument.
WARNING: Have an assistant help you unpack this unit. Do not attempt to do this alone.

Installing the Instrument

Before shipment, the DSC instrument is inspected both electrically and mechanically so that it is ready for
operation upon proper installation. Only limited instructions are given in this manual, consult the online
documentation for additional information. Installation involves the following procedures:
Inspecting the system for shipping damage and missing parts
Connecting the DSC to the TA Instruments controller
Connecting cables and gas lines
Installing a transformer, if needed, for 230 Vac power
It is recommended that you have your DSC installed by a TA Instruments Service Representative, call for an
installation appointment when you receive your instrument.
CAUTION: To avoid mistakes, read this entire chapter before you begin installation.

Inspecting the System

When you receive your DSC, look over the instrument and shipping container carefully for signs of shipping
damage, and check the parts received against the enclosed shipping list.
If the instrument is damaged, notify the carrier and TA Instruments immediately.
If the instrument is intact but parts are missing, contact TA Instruments.
DSC Q Series Getting Started Guide
Chapter 2
Installing the DSC
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q10Q1000Q20Q2000Q100Q200

Table of Contents