Chapter 2: Installing The Dxf System; Unpacking/Repacking; Installing The System; Inspecting The System - TA Instruments DISCOVERY XENON FLASH Getting Started Manual

Hide thumbs Also See for DISCOVERY XENON FLASH:
Table of Contents

Advertisement

Chapter 2:
Installing the DXF System

Unpacking/Repacking

You may wish to retain all the shipping hardware, the plywood, and boxes from the instrument in the event
you wish to repack and ship your instrument.

Installing the System

Before shipment, the DXF is inspected both electrically and mechanically so that it is ready for operation
upon proper installation. Only limited instructions are given in this manual; consult the Help documenta-
tion for additional information. Installation involves the following procedures:
Inspecting the system for shipping damage and missing parts
Choosing a location for instrument installation
Connecting the Environmental Module to Pulse Source Module
Setting up system communication with the controller
Connecting the utilities
It is strongly recommended that you have your DXF system installed by a TA Instruments Service Repre-
sentative; call for an installation appointment when you receive your instrument.
CAUTION: To avoid mistakes, read this entire chapter before you begin installation.
MISE EN GARDE: Pour éviter de commettre des erreurs, lisez tout le chapitre avant de commencer
l'installation.

Inspecting the System

When you receive your DXF system, look over the instrument and shipping container carefully for signs of
shipping damage, and check the parts received against the enclosed shipping list.
If the instrument is damaged, notify the carrier and TA Instruments immediately.
If the instrument is intact but parts are missing, contact TA Instruments.
DXF-200 Getting Started Guide
Page 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxf-200

Table of Contents