Connect The E-Wand To A Zigbee Network; Set Up The Current Products Corp. Bridge With The Mycurtains App - Current E-WAND Installation Manual And User's Manual

Hide thumbs Also See for E-WAND:
Table of Contents

Advertisement

Connecting the E-Wand to
a zigbee network
The E-Wand can be paired to the Current Products Corp. bridge or to a third
party Zigbee hub. If you are using a third party bridge, use the manufacturers
instructions for setup, then follow their instructions for adding devices, then
to put the E-Wand into Zigbee Pairing Mode, press and release the E-Wand
programming button three times. The E-Wand should start slowly beeping
to confirm it is looking for a network. When the E-Wand successfully joins a
Zigbee network it will play Ode to Joy. If the E-Wand instead plays Beethoven's
5th, the E-Wand failed to join a Zigbee network.
About Mesh Networks
Mesh Networks are a web of connected devices that self heal when a unit
becomes disconnected from the network. Zigbee is a communication protocol
that creates a mesh network. Within a Zigbee mesh network, there are "router
nodes" and "end nodes". "Router nodes" repeat a signal and are usually
hardwired for power. "End nodes" do not repeat a signal and are usually
battery powered. E-Wands are "end nodes" so while they will communicate
with each other, they will not communicate with other non-E-Wand devices.
26
7. Set up the Current Products Corp . bridge
with the MyCurtains App
If you would like to set up the E-Wand onto a mesh network using the CPC
Bridge WITHOUT WiFi, please proceed to the next section (pg. 30).
If you have not yet installed your E-Wands, please do so now.
1. Download the App
Download the Current Products Corp. app (MyCurtains) from the Google Play
Store or the Apple App Store. Follow the prompts to set up your account.
2. Power the Bridge
Find an outlet in a location central to the
devices you are installing in the home.
Insert the micro-usb end of the included
power cable into the power port on the
bridge. Plug the other end of the cable
into an outlet [Fig. 7.1]. Place the bridge
at least 2ft off the ground.
The LEDs on the bottom of the bridge
[Fig. 7.2] will be solid red and solid green
during start up. The LEDs will then turn
solid red.
Figure 7.1; Plug in the bridge
Figure 7.2; LED indicators
27

Advertisement

Table of Contents
loading

Table of Contents