Johnson Controls SABROE UniSAB III Engineering Manual page 235

Control system for refrigerating compressors
Hide thumbs Also See for SABROE UniSAB III:
Table of Contents

Advertisement

Set-up
Should the measuring value reach -6.5°C/R, the counting interval will be 3 seconds. If the pressure is
still moving upwards and exceeds -4°C/R (the Pb limit) the timer will count in seconds. The resulting total
delay will range between 60 and 300 seconds and after this the compressor will start.
Example 2: Discharge pressure regulation has been selected on a reciprocating compressor. The
measured discharge pressure equals the set point. The compressor is running at 100% capacity.
Set point Sp = 30°C/R
Nz = 2°C/R Pb = 5°C/R
Delay down = 30 sec
P band factor delay down = 3.
When the measured discharge pressure exceeds 31°C/R, the timer Delay down will start counting with
an interval of 3 seconds (P band factor) each time the value in the display counts one down. If the pres-
sure steadies the timer will run for 3 x 30 = 90 seconds.
Should the measuring value reach 33.5°C/R, the counting interval will be 2 seconds. If the pressure is
still moving upwards and exceeds 36°C/R (the Pb limit) the timer will count in seconds.
The resulting total delay will range between 30 and 90 seconds and after this the compressor will disen-
gage one capacity stage.
Engineering manual - UniSAB III 1.10.8
001930 en 2021.06
235/346

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SABROE UniSAB III and is the answer not in the manual?

Questions and answers

Simon Hammant
January 22, 2025

What is the user code for the Unisab 3.

User image 6790bd61675bd

Table of Contents

Save PDF