Raven Hawkeye 2 Installation Manual page 32

Hide thumbs Also See for Hawkeye 2:
Table of Contents

Advertisement

CHAPTER 5
3. Use a 1-1/2" hole saw to drill two holes through the bottom of the power distribution cabinet to allow passage
of the bulkhead connections of the Hawkeye® 2 power distribution cable (P/N 115-2005-366).
NOTE:
While facing the cabinet, the recommended location for these ports is towards the right half of the
removable bottom plate section of the cabinet as shown in Figure 2, "Power Distribution Cabinet with
Hawkeye® 2 Installed," below.
FIGURE 2. Power Distribution Cabinet with Hawkeye® 2 Installed
Eaton
Fuse Panel
Grounding
Rail
4. Locate the provided Hawkeye® 2 power distribution cable (P/N 115-2005-366).
5. Use the provided M6 hardware to mount the fuse box on the cable to the fuse box mounting rails.
6. Locate the provided 60 Amp fuses (P/N 510-1003-055).
7. Open the Eaton fuse panel and use the provided M5 lock nuts (P/N 312-4000-215) to install the 60 Amp fuses
in the open spaces.
8. Use the provided M8 lock nuts (P/N 312-4000-217) to mount the two red terminals of the power distribution
cable to the output studs of the 60 Amp fuses.
9. Replace the cover on the Eaton fuse panel.
10. Locate the grounding rail on the bottom of the cabinet in front of the fuse panel.
11. Install the black terminal of the power distribution cable using the installed stud hardware.
12. Install the bulkhead connectors into the previously drilled out holes with the nut threaded onto the connector.
NOTE:
While facing the cabinet, install the right boom connector in the left hole and the left boom
connector in the right hole. This orientation will align the connectors to the correct side of the boom
from the perspective of the driver.
28
Hawkeye® 2 Installation Manual for AGCO Fendt RoGator 900 Series
Fuse Box
Left & Right
Bulkhead
Connectors

Advertisement

Table of Contents
loading

Table of Contents