9 Start Up. Operation & Shut Down of the SIHIdry Vacuum Pump

9.1 Preparation

The pump system must be installed according to the instructions in chapter 8 Installation of The
SIHIdry Vacuum Pump

9.2 Personal

9.3 Safety

Copyright:
FLOWSERVE SIHI Pumps
Warning! Risk of injuries may occur due to untrained
personal.
Unauthorized and / or untrained person may get injured
during installation preparation and work
Therefore:
-
Only authorized personal.
-
Use original spare parts.
-
Use only the accessories approved by the
manufacturer.
Warning! Risk of burning due to hot surfaces.
Therefore:
-
Before starting any activity, ensure that all
components are cooled down to the ambient
temperature or
-
Wear protective work clothing and safety gloves
when working near hot components.
Surfaces of inlet, outlet pipes and pump casing may be hot.
The operating company of the device must ensure that the
corresponding sign is affixed.
Warning! Pre-Check Pump Safety.
Therefore:
-
Check the filling height of the cooling water circuit.
-
If explosive, toxic, hot or corrosive gases and vapors
are handled it must be ensured that personnel and
the environment are not endangered.
-
The electrical connection for the pair of motors (pay
attention to the correct direction of rotation) must be
carried out in such a way that the vacuum pump can
only be switched on after release by the Purge
Control.