Planning; Structure Guidelines; Installation Site - WAGO 852-1328 Product Manual

Industrial managed 6 ports 1000base-t; 2 slots 1000base-sx/lx; mac security
Hide thumbs Also See for 852-1328:
Table of Contents

Advertisement

Planning

Planning
6

6.1 Structure Guidelines

6.1.1 Installation Site

The location selected to install the may greatly affect its performance. When selecting a
site, we recommend considering the following rules:
• Install the at an appropriate place. See Section
for the acceptable temperature and humidity operating ranges.
• Make sure that the heat output from the and ventilation around it is adequate.
• Do not place any heavy objects on the .
24
Product manual | Version: 1.2.0
Industrial Managed Switch
8 Environment requirements [} 20]
852-1328
,

Advertisement

Table of Contents
loading

Table of Contents