After the installation is completed, verify the installation against the following list. Be sure that all
check results are positive.
Table 8 Installation checklist
Item
The grounding cable is correctly grounded.
Fan trays are correctly installed and make close contact with the
backplane.
Power modules are correctly installed and have close contact with the
frames.
The power switch is off (the power switch is at the OFF position).
Power cords are correctly connected.
MPUs are correctly installed and have close contact with the
backplane.
LPUs are correctly installed and have close contact with the
backplane.
Switching fabric modules are correctly installed and have close contact
with the backplane.
39
Result
Remarks
Yes
No