H3C S12500 Installation Manual page 21

Routing switch
Hide thumbs Also See for S12500:
Table of Contents

Advertisement

Item
M6*12 screw
M6 cage nut
ESD wrist strap
Cable tie
NOTE:
The number of screws, nuts, and cable ties supplied with the switch depends on those shipped from
the factory.
User-supplied tools and equipment
Mechanical lift
Phillips screwdriver P1 – 100 mm, P2 – 150 mm, and P3 – 250 mm
Flat screwdriver P4 – 75 mm
Marker
Tape
Diagonal pliers, wire-stripping pliers, and wire clippers
Socket wrench
Cables such as network cables and fiber cables
Meters and equipment, such as hub and multimeter
Configuration terminal, such as PC
NOTE:
The rack accessories and installation tools are not included in this section. They might vary
depending on the rack model. For more information, see the installation guide of the corresponding
rack.
Quantity
Purpose
1 set
Secures the switch to the rack.
1 set
2
ESD prevention.
Organizes and secures AC power cords.
Several
Supplied with the S12508 and S12518 switches.
13

Advertisement

Table of Contents
loading

Table of Contents