Omron SYSMAC C200HW-ZW3AT2-E-V2 Operation Manual page 153

Table of Contents

Advertisement

I: System Setup
Peripheral Bus
1, 2, 3...
Host Link
1, 2, 3...
1. Select "P: PC interface" from the System Setup window.
2. Select "T: Peripheral" The Peripheral Bus Window will be displayed.
3. Select the item to be changed. The window corresponding to the item to be
changed will be displayed.
Destination PC
If the Controller Link Support Software is to be connected to a CVM1 or CV-
series PC, set a baud rate of at least 4,800 bps, and if it is to be connected to
a CS1-series PC, set a baud rate of at least 9,600 bps.
4. Select the desired setting from the window.
5. If a C-series PC is selected as the destination PC, the following window will
be displayed to prompt you to select the operating level of the Controller Link
Unit to be used.
If a CQM1H is selected as the PC, be sure to select operation level 0.
6. If another item is also to be set, press the Escape Key to return to the pre-
vious screen.
1. Select "C: PC interface" from the System Setup Window.
2. Select "J: Host Link." The Host Link window will be displayed.
Communications Port
Section
5-14
Baud Rate
139

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sysmac c200hw-zw3at2-e3g8f5-clk11-e3g8f5-clk21-e

Table of Contents