Host Installation - Maiwe MIGE3028-4GF User Manual

Rack mounted industrial ethernet switch
Table of Contents

Advertisement

MIGE3028-4GF Serial Rack Mounted Industrial Ethernet Switch
Separate the path between the power cord and the device line. If the two
paths must intersect, make sure that the lines are perpendicular at the
intersection.Signal lines or communication lines and power lines cannot be
laid in the same pipe. To avoid interference, lines with different signal
characteristics should be separated.We can use the type of signal
transmitted in a line to determine which lines should be separated.The rule of
thumb is that wires with the same electrical characteristics can be bundled
together.Separate the input and output lines.It is highly recommended that all
equipment lines in the system be labeled when necessary.
The switch should be connected to the protection ground:
Grounding and wiring can effectively suppress the effects of noise
caused by electromagnetic interference.A ground connection should be
made before connecting the device, from the ground screw to the grounded
surface.

2.2.2. Host Installation

Switch as a whole is schematically shown in FIG2-7.
MIGE3028-4GF series of schematic front panel shown in FIG.2-8.
FIG2-8MIGE3028-4GF series switch front panel
MIGE3028-4GF -24Trear panel2-9 is schematically shown in FIG.
FIG2-9 MIGE3028 -4GF -24T schematic front panel switch
FIG 2-7 The top side of the machine
- 9 -

Advertisement

Table of Contents
loading

Table of Contents