RK Rose+Krieger RK MultiControl II duo Assembly Instructions Manual page 163

Table of Contents

Advertisement

Available languages

Available languages

20.08.2021
6.
Control unit RK MultiControl II duo/RK MultiControl II quadro
Press and hold the
button until all drives have been
moved into the upper final position.
ð The LED display lights up green.
The initialization run has been completed.
The control unit is ready for operation.
If the upper final position cannot be
reached or an upward stroke limitation is
to be set, the initialization run can be
ended in any position.
To do so, press and hold the
approximately 5 s. The new position for
the upper final position of the drives has
been set.
Operating the hand switch with 2 function buttons
Carrying out initialization
button for
163

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RK MultiControl II duo and is the answer not in the manual?

This manual is also suitable for:

Rk multicontrol ii quadro

Table of Contents