Emerson Bettis XTE3000 Installation, Operation And Maintenance Manual page 17

Table of Contents

Advertisement

Installation, Operation and Maintenance Manual
MDE 255 Rev. 0
BIT
27 HW_ERROR
26 CONFIG_ERROR
25 BASE_COM_FAIL
24 MOT_THERMOST
23 CONTACTOR
22 MID_TRAV_AL
21 JAMMED
20 HI_HI_TORQUE
19 LOW_9V_BATTERY
18 EFS_MID_TRAVEL
17 PST T-PST
16 PST T-RET
F
™ Fieldbus Overview
oundation
CONDITION
x
x
x
x
x
x
x
x
x
x
Section 5: F
DESCRIPTION
The diagnostic program
detects some malfunction in
the electronics controlling
the actuator.
The checksum of the EEPROM
memory that contains the
configuration data is wrong.
The communication
between Interface card and
motherboard card is lost.
Motor thermostat open for
high temperature in the
motor windings.
The test routine reports a
failure of contactor (coil or
auxiliary contact).
The valve does not move in
presence of an open or
close control.
No position change after
receiving an open or
close control.
Measured torque greater than
the relevant value configured
in torque setup or stroke
limits routine.
The voltage of the lithium
battery is too low (only
detected if the lithium
battery is present and the
relevant parameter of the
miscellaneous routine is set to
"present").
The position is > 4% after
ESD action.
Time needed to change the
position of the PST TRAVEL by
x
the spring action out
of specification.
Time to return to position
x
before testing out of
specification.
™ Fieldbus Overview
oundation
January 2022
RECOMMENDED ACTION
Some circuit is damaged and
does not work (Call Bettis
After-sales service to solve
the problem).
Reconfigure all parameters
(See details next page).
Check the main power supply,
or replace the Hardware
(Base card and Interface card).
Wait until the motor
cools down.
Check the contactor.
Check status of actuator
and valve mechanical parts.
Recalibrate both stroke limits.
Check status of actuator and
valve mechanical parts.
Operate the actuator in
opposite direction. Check the
torque needed to operate
the valve.
Change lithium battery.
Check reset time,
check electrical stroke limits,
check mechanical stops.
Check baseline values and
parameter T-PST.
Check baseline values and
parameter T-RET.
13

Advertisement

Table of Contents
loading

Table of Contents